National Repository of Grey Literature 9 records found  Search took 0.00 seconds. 
Integrated Call Centre Český Těšín, Preparation for Construction
Kovář, Jakub ; Průcha, Aleš (referee) ; Šlanhof, Jiří (advisor)
The subject of the diploma thesis is the elaboration of the construction and technological project for the new Integrované výjezdové centrum Český Těšín. In the proposed area, there will be the Fire and Rescue Service of the Moravian-Silesian Region – branch Český Těšín, Municipal Police Český Těšín, and the Police of the Czech Republic – district department and department of criminal police service and investigation. The diploma thesis is exclusively focused on the Fire and Rescue Service facility. The content of this thesis includes a technical report, a coordination situation of the construction with broader relations of traffic routes, a time and financial plan – object-oriented, a study of the implementation of the main technological stages of the construction object, a project of the construction site along with a calculation of construction site equipment costs, a proposal for the main construction machines and mechanisms, a time schedule, a plan for ensuring material resources for the rough construction, a technological specification for monolithic ceiling structures along with a drawing of ceiling formwork, a control and testing plan, and a budget for the completed building SO 01.
Construction Project for Implementation of Municipal Library in Slapanice
Hudcová, Natálie ; Doubek, Rostislav (referee) ; Nečasová, Barbora (advisor)
This thesis aims to formulate the construction technology project describing the municipal library in Šlapanice as a newly constructed building. The footprint plan of the designed object has the shape of the letter L. Part of the object facing towards the street serves for restaurant and cafe purposes, is single floored, and its roof is divided into two sections, starting with a gable roof followed by a flat roof. The building is located perpendicularly to the Riegrova street. The second part of the municipal library's building consists of two floors and is partially embedded in the slope. Its roof is divided into a gable roof and a flat roof as well. The purpose of this thesis is to develop a technical report on the construction technology project, a study describing the implementation of the main technological stages of the construction object, research of the transportation network, and the time and financial plan of the construction project. Further, this work presents the construction site equipment project, construction machines and mechanization proposal, technological regulations for the monolithic ceiling structure and trusses implementation, resource assurance plan, inspection and test plan, and health and safety plan for selected processes. Later, this thesis focuses on the itemized budget for the chosen technological processes of the construction object, the main lifting mechanism proposal and assessment, drawings related to selected technological regulations and LEED certification.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Kindergarten Kuřim - construction technology project
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
Construction Project for Implementation of Apartment Building Prazakova
Staněk, Martin ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis solves processing of dokuments for realization of a new residental building on Pražákova in Brno. This thesis includes technical reports in individual chapters, a study of implementation of main technical stagesm project of construction site equpiment, traffic solution, a time and financial plan, a technological proscriptions, inspection and testing plans, occupational safety and health and an economic evaluation of machinery utilization.
Kindergarten Kuřim - construction technology project
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.